Spar Supermarket Muldenstraße, Linz, Austria

  • Tipologia costruzione:
  • Edifici commerciali
Schermo intero Chiudi

For the Spar Supermarket it was necessary to have a column free span line of 12 meters, which was solved using hollow-core slabs. The entrance side support of the hollow-core slabs was solved with DELTABEAM® Composite Beams as a slim floor construction.

Informazioni sul progetto

Investitore:
Spar AG, Salzburg
Impresa di costruzioni:
Jos. Ertl, Linz
Strutturista:
Heinzel und Partner, Linz
Anno della fornitura:
2013
Fine lavori:
2013

Contattaci

Günther Pock

Günther Pock

Vertrieb & Anwendungsberatung West

Mob. +43 664 381 74 05
[email protected]