Federal Chancellery of Germany, Berlin, Germany

  • Tipologia costruzione:
  • Altri edifici pubblici
Schermo intero Chiudi Street View

Bolted connections for precast concrete parts in the largest government headquarters in the world

In order to build the Federal Chancellery in Berlin, Peikko's bolted connections were used for the precast concrete elements, some of which were made in white pigmented exposed concrete.Anchor bolts and column shoes for precast columns as well as wall shoes in connection with anchor bolts enabled efficient assembly of the reinforced concrete supporting structure.  

Together with the Marie-Elisabeth-Lüders House and Paul-Löbe Building, the Federal Chancellery is part of the "Federal Belt" (German: "Band des Bundes"), an architectural symbol of the German unity. The building complex was built when the goverment of Germany moved from Bonn to Berlin about ten years after the German reunification 1989.

Leggi tutto down-arrow.png

The construction with its unusual variety of shapes in exposed concrete required very high standards in structural design and building physics.

GSE Ingenieurgesellschaft mbH

Informazioni sul progetto

Dimensioni del progetto:
25347 m2
Pavimenti:
8
Investitore:
Im Auftrag der Bundesrepublik Deutschland für die Bundesregierung Bundesbaugesellschaft Berlin
Impresa di costruzioni:
Arge Rohbau Bundeskanzleramt, Hmb Hallesche Mitteldeutsche Bau AG, Wayss & Freytag AG, Hoch- und Wirtschaftsbau, Cubiertas Y Mzov GmbH
Strutturista:
GSE Ingenieurgesellschaft mbH
Architetto:
SCHULTES FRANK ARCHITEKTEN
Fine lavori:
2001

Contattaci

Tobias Althaus

Tobias Althaus

Managing Director

Peikko Deutschland GmbH

Mob. +49 170 163 8168
[email protected]