Job Center Waldeck-Frankenberg, Germany

  • Tipologia costruzione:
  • Educazione e cultura
  • Altri edifici pubblici
  • Edifici per uffici
Schermo intero Chiudi

Sustainably planned and built for the future

A modern administrative building for the Waldeck-Frankenberg Job Center was constructed in the heart of the administrative center of the city of Korbach. Taking into account high requirements for digitization, accessibility, and sustainable construction, a future-proof workplace was created. The building can be used flexibly and expanded as needed.

The building uses DELTABEAM® composite beams and HPM® anchor bolts from Peikko. DELTABEAM® has excellent fire resistance without any additional protection. Its shallow design decreases a building’s floor-to-floor height while eliminating conflicts with HVAC systems, saving time and money.

Leggi tutto down-arrow.png

The installations can be routed directly under the slabs without any detours. This saves time and money compared to normal reinforced concrete beams.

Köster GmbH

Informazioni sul progetto

Dimensioni del progetto:
4000 m2
Pavimenti:
3
Investitore:
HBG Fünfte Projekt GmbH
Impresa di costruzioni:
Köster GmbH
Strutturista:
Mehlhorn und Vier Ingenieurgesellschaft mbH
Architetto:
Architekturbüro Van Döllen
Anno della fornitura:
2024
Fine lavori:
2025

Contattaci

Daniel Ferger

Daniel Ferger

Technische Beratung Verbundbau

Tel. +49 6436 9491643
Mob. +49 173 625 3400
[email protected]