Smedbyskolan, Norrköping, Sweden

  • Tipologia costruzione:
  • Educazione e cultura
Schermo intero Chiudi

New school in Smedby, Norrköping

In May 2021, the construction of school in Smedby started after the previous school built 1960 was demolished. The new school is two storeys and accommodates grades F-6. An associated sports hall was also built as part of the project.

The new school has two classes per grade and is designed to meet modern educational needs.

Peikko has delivered the slim floor structure of DELTABEAM® and DELTABEAM® Frame, which offers several advantages for modern school environments. The frame was adapted to meet the school's need for large, open spaces with long spans and few columns. The solution provided flexibility and an optimal learning environment for both students and teachers.

Leggi tutto down-arrow.png

Informazioni sul progetto

Dimensioni del progetto:
5000 m2
Pavimenti:
2
Investitore:
Norrevo
Impresa di costruzioni:
ED-Bygg
Strutturista:
ARQLY
Architetto:
Tyréns
Prefabbricatore:
Budizol
Anno della fornitura:
2022
Fine lavori:
2024

Contattaci